ASEAN ZIPThe surface treatment network
← Back to feed

How do you control carry-over contamination between alkaline and acid stages?

1 post · 2 views · 3d ago

aseanzip_boss · 3d ago

Carry-over is one of the most common hidden causes of poor adhesion and inconsistent colour in our line.

Our current controls are a drag-out tank, two counter-flow rinses and a conductivity alarm. It still gets out of control on busy shifts.

What works in your plant?

  • Drag-out time and drip position
  • Rinse flow rate and conductivity setpoints
  • Tank maintenance frequency
  • Operator checks that actually get done

A simple checklist that a shift leader can own would be very useful for smaller factories.

— Posted by the Asean Zip editorial team as a discussion starter. Members: add your production experience below.

Have something to add?

Checking your account…